The LIRR Expansion Project from Floral Park to Hicksville, one of the region’s most significant transportation infrastructure projects, is now underway throughout the communities along a nearly ten mile stretch of mainline track.
During the month of July, you will see construction crews performing work in Floral Park. Specifically, there will be crews taking geographic surveys of the roads around and near the rail road; ensuring that any disturbed rodents and pests are controlled; digging test pits to locate existing underground utilities; and conducting pre-construction inspections of the existing conditions of structures surrounding worksites. A temporary field construction yard will also be set-up at the corner of Lily Street and Carnation Avenue. By way of explanation:
Existing Roadway Surveys
- A specially equipped van is driven to specific points to video and photograph the condition of the existing roadways, prior to construction beginning
- The survey is conducted to ensure the roadways are protected in the unlikely event of any damage
Rodent and Pest Control
- Clearing and preparing property for construction may cause the natural habitat of some rodents and other pests to be disturbed
- We are aware of this and are taking all of the necessary steps to minimize any impacts this may have on you or adjacent LIRR property
- We will deliver effective rodent and pest control, while at the same time minimizing the volume and toxicity of pesticides used by incorporating tamper-proof stations that limits any pesticides used to inside the stations
- Control techniques include a combination of pest monitoring, good sanitation practices, education, appropriate solid waste management, and the use of pesticides, when warranted, according to application techniques
Existing Structure Surveys
- Property located within a specified radius of anticipated construction work requires a pre-construction photo inspection
- The survey is conducted to ensure the property is protected in the unlikely event of any damage
- Vibranalysis Inc., an independent consulting firm, will perform the survey
- Inspection consists of photographs and written documentation, recording the existing conditions of the interiors and exteriors of the structures surrounding the site
Temporary Field Construction Yard
- At the corner of Lily Street and Carnation Avenue, 3TC is establishing a temporary field construction yard, which the construction team will utilize for equipment and supplies
Existing Underground Utilities Identification
- To ensure community and worker safety, crews will dig test pits to locate existing underground utilities, in preparation for the installation of the new elevator for Floral Park station